GRMPS
Active Member
Ian, what PC are you referring to with the bake time starting after the substrate has reached 400°
------ I found it
It seems most people ARE NOT baking PC long enough!!!!
the following has been my experience (note the bake time is 20 min after, not 10 total)
I guess the bake time is relevant to how/when you start gauging it
https://www.powderbuythepound.com/super-durable-wet-black.html
Cardinal paint CURE SCHEDULE: (METAL TEMPERATURE) 10 MINUTES @ 400 DEGREES F.
https://www.eastwood.com/hotcoat-powder-ford-light-blue.html
SPECIFICATIONS
Color: Ford Light Blue
Gloss Level: Gloss
Cure Temperature: 400 Degrees
Cure Time: 20 Minutes after flowout
Powder Type: Polyester TGIC
------ I found it
It seems most people ARE NOT baking PC long enough!!!!
the following has been my experience (note the bake time is 20 min after, not 10 total)
I guess the bake time is relevant to how/when you start gauging it
https://www.powderbuythepound.com/super-durable-wet-black.html
- Cure Schedule = 400f/10 Min at Part Metal Temperature
Cardinal paint CURE SCHEDULE: (METAL TEMPERATURE) 10 MINUTES @ 400 DEGREES F.
https://www.eastwood.com/hotcoat-powder-ford-light-blue.html
SPECIFICATIONS
Color: Ford Light Blue
Gloss Level: Gloss
Cure Temperature: 400 Degrees
Cure Time: 20 Minutes after flowout
Powder Type: Polyester TGIC