Dimner
Named Man
A couple weekends ago I bought a couple cast iron pots at the flea market. One that holds 40 or so lbs of lead and another that holds probably over 70.
Problem is, that when I bought them they were nested together, so I didn't notice the perfectly drilled hole in the bottom of the bigger pot. It's probably a 1/4".
So, short of welding (which i do not have the skill or equipment to do), anyone have any ideas on the best way to plug this hole so it can be used to smelt lead?
If welding is the only option, is there a specific type of welding that would work best?
Problem is, that when I bought them they were nested together, so I didn't notice the perfectly drilled hole in the bottom of the bigger pot. It's probably a 1/4".
So, short of welding (which i do not have the skill or equipment to do), anyone have any ideas on the best way to plug this hole so it can be used to smelt lead?
If welding is the only option, is there a specific type of welding that would work best?